Production base overview
Source:Hangzhou Resource Power Equipment Co., Ltd. Release time:2017-02-28
RESOURCE HYDRO, located in Hangzhou Dajiangdong Industrial Cluster, possesses a 100,000m2 modern heavy manufacturing base and has the casting workshop, component workshop, metalworking and assembling workshop, electrical coil workshop, physical and chemical electrical laboratory, etc. RESOURCE HYDRO has an annual production capacity up to 2,000MW in terms of complete turbine-generator units, up to 10,000t in terms of high-end castings and up to 6,000t in terms of power generating equipment components.