Guizhou Puding Hydropower Station (Reconstruction)
Source: Release time:2021-01-23
Guizhou Puding Hydropower Station (Reconstruction)
(Rated head: 47.5m; installed capacity: 3×29MW)
Source: Release time:2021-01-23
Guizhou Puding Hydropower Station (Reconstruction)
(Rated head: 47.5m; installed capacity: 3×29MW)
Copyright@2016 Hangzhou Resource Power Equipment Co., Ltd. all rights reserved
No.2688 Weiwu Rd. Linjiang High-Tech Park, Hangzhou Qiantang New Area.China E-mail