San Jose Hydropower Station in Bolivia
Source: Release time:2021-01-23
San Jose Hydropower Station in Bolivia
San Jose 1: rated head, 294m; installed capacity, 2×27.5MW
San Jose 2: rated head, 342m; installed capacity, 2×34.5MW
Source: Release time:2021-01-23
San Jose Hydropower Station in Bolivia
San Jose 1: rated head, 294m; installed capacity, 2×27.5MW
San Jose 2: rated head, 342m; installed capacity, 2×34.5MW
Copyright@2016 Hangzhou Resource Power Equipment Co., Ltd. all rights reserved
No.2688 Weiwu Rd. Linjiang High-Tech Park, Hangzhou Qiantang New Area.China E-mail